Call off Contract for Replacement of Old Distribution Equipment 

Print This Page
8/2/2006  - 8/1/2008 
 

Project Impact : Enhance the performance of the electrical network by reducing possibility of fault and improve SAIFI figure as a result, this also will extend proposed lifetime for the sub-stations and other replaced assets(transformers, PMT, Feeder Pillars, Switch Gears, etc..)
When reducing the possibility of faults and faulty equipments then we are on the right track to purify the environment.