QATAR POWER TRANSMISSION SYSTEM EXPANSION SUBSTATIONS PACKAGE S-8 

Print This Page
  -  
 

132/11kV Al Kara'ana: New Transmission Substation incorporating 132kV GIS, 11kV metal enclosed switchgear (GIS), 132/11kV power transformers, 11/0.415kV station transformers and associated equipment.

132/11kV Madinat Al-Kabaan: New Transmission Substation incorporating 132kV GIS, 11kV metal enclosed switchgear (GIS), 132/11kV power transformers, 11/0.415kV station transformers and associated equipment.

132/11kV Al-Ruwais: New Transmission Substation incorporating 132kV GIS, 11kV metal enclosed switchgear (GIS), 132/11kV power transformers, 11/0.415kV station transformers and associated equipment.

132/11kV Al Zubarah: New Transmission Substation incorporating 132kV GIS, 11kV metal enclosed switchgear (GIS), 132/11kV power transformers, 11/0.415kV station transformers and associated equipment.