Connection Fees
09.09.2013
CONNECTION FEES TABLES
Supply Connection for Rented – Existing Building
09.09.2013
Learn Basic steps to supply connection for rented – existing buildings.
Supply Disconnection for Rented – Existing Building
09.09.2013
Learn Basic steps to supply disconnection for rented – existing buildings.
New Connections of Electricity and Water Services
09.09.2013
Learn the basic steps to apply for New Connection of Electricity and Water Services, this service is designed for new buildings and premises that have building permit and under construction. The owners/customers are advised to apply to this service, through certified contractor, at least six months prior to expected completion date.
Practical Tips to Reduce your Consumption and Your Bill
09.09.2013
Help us to protect the nature and the environment by reducing your electricity and water consumption, stop irrational use of them by applying the Conservation Law. Learn some practical tips to help you reduce your electricity and water consumption and your bill.
Additional Connection Services
09.09.2013
Learn the basic steps to apply for Additional Connection Services; i.e. Temporary Service Connection, Service Relocation, Separate Supply, Service Upgrade, and Additional Meter.
Repair or Replace Defected Meters (Electricity and Water)
09.09.2013
Learn the basic steps to Repair or Replace Defected Meters (Electricity and Water).
Code of Practice: Visiting Customer Premises
09.09.2013
This document is prepared to inform public/customer about the Code of Practice applied by KAHRAMAA on why and when we visit customer premises, so customer can be sure that all visits are made by KAHRAMAA’s genuine representatives.
KM Regulations for Works in the Vicinity of ET Installations - Issue 1
23.11.2014
KAHRAMAA Regulations for Works in the Vicinity of Electricity Transmission Installations
Electricity Distribution - Guidelines for excavation works in the vicinity of MV/LV cables
21.04.2015
This procedure are prepared and published for all Contractors and Consultants to organize the appropriate activities in order to confirm the method statement for work in the MV and LV network (cable & OHL) vicinity to avoid any damage to the KM distribution network and to avoid any interruption of supply due to improper way of work by the Third Party Contractor.
This Guidelines are prepared and published for all Contractors and Consultants as a guide, to explain the procedures the Third party Contractors shall follow at the site when working in the vicinity of MV/LV cables / OHL. Third party Contractor to submit specific Method statement to work in vicinity of existing MV/LV cables / OHL wherever required based on the field conditions. The consultant of the contractor to review and approve such Method statement.
We aim for dissemination to describe the steps to be followed for below mentioned processes: -
•Confirmation of all formalities completed by the Contractor before working in vicinity of MV and LV cables/OHL.
•Specific remarks for carrying out the work in vicinity of network.
•Method statement of work for protection of the cables and OHL.
•Approve/renewal of SIS application for defined period of work.
•Appropriate safety documents issuing (if required).
Electricity Distribution - Guidelines for works in the vicinity of MV/LV OHL
21.04.2015
This procedure are prepared and published for all Contractors And Consultants to organize the appropriate activities in order to confirm the method statement for work in the MV and LV network (cable & OHL) vicinity to avoid any damage to the KM distribution network
and to avoid any interruption of supply due to improper way of work by the Third Party Contractor.
This Guidelines are prepared and published for all Contractors And Consultants as a guide, to explain the procedures the Third party Contractors shall follow at the site when working in the vicinity of MV/LV cables / OHL. Third party Contractor to submit specific Method statement to work in vicinity of existing MV/LV cables / OHL wherever required based on the field conditions. The consultant of the contractor to review and approve such Method statement.
We aim for dissemination to describe the steps to be followed for below mentioned processes: -
•Confirmation of all formalities completed by the Contractor before working in vicinity of MV and LV cables/OHL.
•Specific remarks for carrying out the work in vicinity of network.
•Method statement of work for protection of the cables and OHL.
•Approve/renewal of SIS application for defined period of work.
•Appropriate safety documents issuing (if required).
Procedure for -Work in Vicinity of MV and LV Network– Service Information Sheet (SIS)
21.04.2015
This procedure are prepared and published for all Contractors And Consultants to organize the appropriate activities in order to confirm the method statement for work in the MV and LV network (cable & OHL) vicinity to avoid any damage to the KM distribution network
and to avoid any interruption of supply due to improper way of work by the Third Party Contractor.
This Guidelines are prepared and published for all Contractors And Consultants as a guide, to explain the procedures the Third party Contractors shall follow at the site when working in the vicinity of MV/LV cables / OHL. Third party Contractor to submit specific Method statement to work in vicinity of existing MV/LV cables / OHL wherever required based on the field conditions. The consultant of the contractor to review and approve such Method statement.
We aim for dissemination to describe the steps to be followed for below mentioned processes: -
•Confirmation of all formalities completed by the Contractor before working in vicinity of MV and LV cables/OHL.
•Specific remarks for carrying out the work in vicinity of network.
•Method statement of work for protection of the cables and OHL.
•Approve/renewal of SIS application for defined period of work.
•Appropriate safety documents issuing (if required).
- Electricity Distribution – Cable Jointer, Linesmen, Fitter, MV Panel Protection Testing Engineer, MV Panel Protection Testing Assistant , LV Panel Protection Testing – License Procedure
21.04.2015
This procedure is prepared and published for all contractors.
We aim for dissemination to describe the steps to be followed for below mentioned processes: -
• How to apply for a License
• How to renew the license, and
• How to request for a replacement license.
Note: Any Contractor should obtain this license in order to allow him to do the work of Electricity Distribution - Cable Jointer/ Linesmen, Fitter/ MV Panel Protection Testing Engineer/ MV Panel Protection Testing Assistant / LV Panel Protection Testing.
- Electricity Distribution – Application form for Cable Jointer, Linesmen, Fitter, MV Panel Protection Testing Engineer, MV Panel Protection Testing Assistant , LV Panel Protection Testing – License Procedure
21.04.2015
This form is part of the Application process for Licensing. This form has to be duly filled, stamped and uploaded to online application process as described in the Procedure.
Electricity Distribution – Application form for Service Information Sheet (SIS) to Work in Vicinity of MV and LV network
22.04.2015
This form is part of the Application process for SIS to Work in Vicinity of MV and LV network . This form has to be duly filled, stamped and submitted to the EDM section along with the required documents as described in the form and the Procedure.
Low Voltage Electricity& Water Installations Regulations - ELECTRICTY WIRING CODE 2016
Low Voltage Electricity& Water Installations Regulations - ADVANCED METERING INFRASTRUCTURE CODE 2016
Low Voltage Electricity& Water Installations Regulations - DISTRICT COOLING Design & Water Management code 2016
Low Voltage Electricity& Water Installations Regulations - ENARGY & WATER CONSERVATION CODE 2016
Electricity Planning Regulations for Supply
13.03.2018
This document gives a guideline and overview of the building permit procedures, regulations and conditions from a network planning point of view...
Low Voltage Electricity& Water Installations Regulations - ELECTRICTY WIRING CODE 2018